Slave Lake 3rd Street Watermain
Slave Lake, AB

Client:
Start date:
End Date:
Contract Value:
Contract type:
Town of Slave Lake
July 2022
October 2022
$2.7 Million
Unit Rate
Construction worker overseeing a trench with an excavator in the background

Project Purpose

  • Implemented and maintained all traffic accommodation systems while upgrading aging line.
  • Temporary water run to affected homes and businesses.
  • Sawcut and removal of sidewalks, curbs, driveways and Affected roadway.
  • Established and maintained strong relationships with residents and businesses.

Completed Scope of Work

  • 400m ductile waterline excavation and disposal
  • 275m of sanitary and storm install
  • Removals/disposal of concrete, asphalt & manholes
  • 5,000 tonne of granular base install
  • Geotextile and erosion control installation
  • 38 temporary water services
  • 45+ m auger shot under railway ROW.
  • Required 5m x 15m launch pit and slide rail
Trench shoring system with an auger boring machine and worker inside the pit

Seamless scheduling starts with one point of contact.

Tell us what you’re building. We’ll bring in-house crews and seamless scheduling to deliver the civil scope — from earthworks and underground to roads and paving.

Excavator machinery on a civil engineering construction site
15851 116 Ave
Edmonton, Alberta
T5M 3W1


Logo